Permits, grid connection and auctions

Reversa follows regulators and ministries in each market and links their rules, deadlines and precedents to your projects.

  • Applicable rules per project

    Permits and grid connection requirements for each asset, by country.

  • Auctions and tenders, in advance

    Tenders, support schemes and consultations, with each deadline in the calendar.

  • Positions backed by precedent

    Decisions by other regulators on the same question, cited.

For the energy transition. Utilities, renewables developers, grid operators and oil and gas companies

Requirements per project and country. Permits and grid connection rules, mapped to each asset

Portfolio · ACME Energy

  • Solar + storage · 200 MW Ohio · PJM14 rules
  • Onshore wind · 60 MW Scotland11 rulesConsultation open
  • Solar · 120 MW Antofagasta9 rules
  • Wind farm · 48 MW Galicia12 rules
Ohio · PJM

Solar + storage · 200 MW

  1. Federal

    • FERC Order No. 2023 · interconnection
    • FERC Order No. 841 · storage in wholesale markets
  2. State

    • Certificate · Ohio Power Siting Board

Auction calendar by market. Tenders, support schemes and consultations, with each deadline

Auctions and tenders
  • Onshore wind tenderBids due 1 Nov
  • Contracts for Difference roundApplication window open
  • Capacity Investment Scheme tenderBids from 10 Nov
  • Transmission auctionAuction on 18 Dec

Procedure open Deadline Today

Onshore wind tender · Bundesnetzagentur

  • 1 Nov 2026Bid and financial security due
  • 1 Feb 2027Next bidding date
  • 1 May 2027Following bidding date

Positions argued with precedent. Decisions of other regulators on the same question, compared and cited

Grid connection queue reform

  1. 1United States · interconnection reformCluster studies, first-ready first-served, readiness depositsFERC Order No. 20232023
  2. 2Great Britain · connections reformQueue re-ordered so ready and needed projects connect firstOfgem decision on TMO4+2025
  3. 3Spain · access milestonesAccess permits lapse when administrative milestones are missedReal Decreto-ley 23/2020 · art. 12020
Submission · grid connection reform.docx

Readiness, not filing date, should order the queue

Serial queues reward early filings over viable projects. FERC replaced serial studies with cluster studies and readiness requirements in 2023.1 Ofgem approved a queue ordered by readiness and system need in 2025.2

Requirements for new technologies. Applicable rules and dates, before the investment decision

Del. Reg. (EU) 2023/1184

Electrolyser · 100 MW

Renewable hydrogen (RFNBO) · planned start Q3 2027

  • AdditionalityExempt to 2038
  • Temporal correlationPlan for 2030
  • Geographical correlationMet

Why the start date matters

Electrolysers in operation before 1 Jan 2028 are exempt from additionality until 1 Jan 2038

1 Jan 2028Hourly matchingExemption ends
  • Start Q3 2027 · exempt until 2038
  • Start Q2 2028 · additionality from day one

Illustrative example

The value of a year of permitting

RED III caps permit-granting at 12 months inside renewables acceleration areas and at two years outside them. For a plant with known output, the difference is revenue that arrives a year later.

Formula

Revenue deferred = (maximum months − 12) × monthly output × captured price

Example project · 50 MW solar plant

Expected output
8,000 MWh a month
Captured price
€50/MWh
Revenue per month
€400,000
Permitting caseRevenue deferred
  • Inside an acceleration area12 monthsReference
  • Outside an acceleration area24 months€4.8M
  • Outside, with extension30 months€7.2M

€4.8Mof revenue deferred outside an acceleration area

Project figures are illustrative; legal figures come from the official text. Durations are statutory maxima, not forecasts; extensions require extraordinary circumstances.

One system for all regulatory work

Explore the product
  • Map what applies
  • Act before the rule arrives
  • Shape the rules
  • Answer with evidence
  • Run compliance
  • Launch and expand

Security that can be verified

Independently tested, covered by a Data Processing Agreement, with reports shared under NDA.

Security

Common questions

Yes. Reversa works on official sources from the first day; your own documents are optional. When you add them, they are stored in data centres in the European Union and never used to train models.

Regulators, ministries, system operators, public consultations and legislative procedures, in each market where you operate. The catalogue of official sources grows every week.

Yes. State, provincial and regional rules sit alongside national and supranational law, so each plant and project is linked to the rules of its location.

Start with your most complex regulatory problem