Reversa reads each area's plan, follows every procedure with the authorities, drafts replies and reports, and checks the building code. Your team approves.

  • The plan of each area

    Land class, zoning, permitted uses and buildability, read from the plan.

  • Procedures, followed up

    Requests, replies and deadlines with each authority, with drafts ready.

  • Building code, calculated

    Planning limits, fire safety and energy checked on each design.

For real estate and land. Developers, land managers, planning consultancies and real estate advisors

Each area's plan, understood. Land class, zoning, uses and buildability, with the plan article behind each

Planning · Sector R-3 partial plan

  • Residential
  • Commercial
  • Green space
  • Facilities

Plot RC-2 · Sector R-3

What can be built on this plot

Land class
Developable, zoned
Zoning
Multi-family residential
Compatible uses
Ground-floor retail, offices
Not allowed
Industry, logistics
Buildability
1.2 m² per m² of plot
Maximum height
Ground + 4 floors · 16 m

Partial plan · zoning ordinances · art. 42

Every constraint on a planning area. Official map layers checked against the area, each with its legal basis

Constraints · Sector R-3, north expansion

  • Road
  • Watercourse
  • Natura 2000
  • Aviation easement

Sector R-3 · north expansion

4 constraints on this area

  • Building line along the state roadLaw 37/2015 on roads
  • Easement and police zones along the streamWater Act · RDL 1/2001
  • Adjacent protected site: may need an appropriate assessmentLaw 42/2007 on natural heritage
  • Height limits from the airport's easementsRD 369/2023 on aviation easements

The reports each plan needs. Water, roads, aviation, environment and heritage, each with its status

Sector reports · Sector R-3 partial plan

  • River basin authorityWater Act · art. 25.4 RDL 1/2001Requested
  • Ministry of Transport · State roadsLaw 37/2015 on roads · art. 16Requested
  • Ministry of Transport · Aviation easementsRD 2591/1998 · additional provision 2Received
  • Regional environment authorityLaw 21/2013 on environmental assessmentTo request
  • Regional heritage authorityRegional heritage lawTo request

Ministry of Transport · State roads

Law 37/2015 on roads · art. 16

  1. Plan sent before initial approval
  2. 2Binding report requested from the Ministry
  3. 3Conditions added before final approval

Every procedure, followed up. Requests, reminders and replies drafted for the team to review and send

Procedures · Sector R-3 partial plan

  • Request for a flood studyRiver basin authorityReply in 10 days
  • Reply drafted with the study attachedRiver basin authorityTo review
  • Reminder drafted for the roads reportMinistry of Transport · State roadsDraft
  • Status report drafted for the developerSector R-3 · weekly reportReady

Draft reply

Reply to the flood study request

Attaches the flood study and moves the housing plots out of the stream's flood zone, keeping that strip as green space.

Attached
Flood study · amended plan
Review before sending
Project architect
EditApprove draft

The calculations a project needs. Planning limits, fire safety and energy, checked against the plan and building code

Checks · plot RC-2, 52 homesBasic design · partial plan and building code
CheckAllowedProjectResult
Floor area6,240 m²6,180 m²Meets
Height16 m15.6 mMeets
Structural fire resistance (CTE DB-SI)R 60R 90Meets
Parking spaces93 minimum894 short
Energy (CTE DB-HE)Primary energy limitAwaiting dataOpen

Rules applied

  • European UnionNew buildings must be zero-emission from 2030Directive (EU) 2024/1275 · art. 7
  • SpainAt least 40% of residential floor area for protected housing in new developmentRDL 7/2015 · art. 20.1.b
  • SpainEnergy saving requirements of the Building Technical CodeCTE · DB-HE
  • Development standards of the regional land lawLaw 9/2001 on land · Community of Madrid

Planning changes on the land portfolio. Amendments and land laws in Spain and across Europe, matched to each area

Agent · Planning changes on our land

SpainInitial approval of a general plan amendment in a municipality with land in the portfolioRegional bulletin · Town council

CataloniaBill to amend the Catalan urban planning lawParliament of Catalonia · Bill

SpainNew regional roads plan with a corridor next to one of the portfolio's areasRegional bulletin · Transport department

GermanyFederal Building Code change to speed up housing approvalsGermany · Federal Law Gazette

United KingdomNational planning policy update on housing deliveryEngland · Government consultation

Why it matters

The amendment turns part of Sector R-3 into green space. Review its buildability before the public comment period ends.

Areas affected · Sector R-3 · north expansion

ReviewedAssignCreate task

One system for all regulatory work

Explore the product
  • Map what applies
  • Act before the rule arrives
  • Shape the rules
  • Answer with evidence
  • Run compliance
  • Launch and expand

Security that can be verified

Independently tested, covered by a Data Processing Agreement, with reports shared under NDA.

Security

Common questions

Any part of the European Union and the United Kingdom, on demand. Reversa follows EU law and the national, regional and local bulletins each client needs, and adds new sources when a project calls for them.

No. Reversa reads the plan and the regulation, drafts replies, reports and calculations, and tracks each procedure with the authorities. Architects, planners and consultants review every draft and decide what is sent.

Reversa connects to your tools through secure connectors and MCP. During setup we agree which of your systems to connect and what data Reversa can read.

Start with your most complex regulatory problem

Real estate & land | Reversa